
Technical Services
Surveying
Vertical and horizontal track alignments surveys
Clearance to all line side structures, including Overbridge and tunnel profiles
Monitoring the track infrastructure, including embankments, to establish the extent of any movements or deteriorations via the use of a Geismar Diamond S track recording trolley, with void meters to ensure dynamic geometry is recorded
We have the capability to carry out Laser Sweep Surveys
Design
Design of vertical and horizontal track alignment and drainage solutions to the relevant Network Rail standards
Designing alignments for new tracks, with or without formation or drainage designs
Setting Out
Marking cants and transitions for on-track machine work
Producing "as builts" against design to demonstrate that the track has (or has not) achieved the accepted track geometry tolerances
Setting out for permanent way and drainage designs, within existing rail operations or on a green field site
Setting out new switch and crossing alignments to enable construction of new layouts prior to installation
CAT Scanning to Network Rail Standards
Track Quality Supervisor
Capability to provide Hallad Method surveying
Stressing (Levels 1-3), from maintaining stress to the stressing of CWR, in all situations
Verse Testing
Providing a full package for monitoring CRT sites in hot weather
Track Hanback Engineers
Designing alignments for new tracks, with or without formation or drainage designs
CRT Management
Meet the Head of Track Services
Graham Eastabrook - Professional Head of Track Services
Graham has been with TES since 2012, with a wealth of experience that only comes with… well… experience. He is a Fellow of the Permanent Way Institute and a Fellow of the Chartered Management Institute. Graham leads all track-related projects.
Contact Us
Interested in working together? Fill out some info and we will be in touch shortly. We can’t wait to hear from you!
Explore more of TES
Want to explore more of what TES have to offer? Use the search function below