
Rail Defect Rectification
For Network Rail's Romford DU, we delivered essential rail defect rectification. This project showcases our expertise in CWR installation and, crucially, our unwavering commitment to safety and quality, culminating in a highly successful Network Rail Principal Contractor audit.

Network Rail Leaning Structures
Tackling complex OHL renewals on challenging ground conditions: Our 'NWR Leaning Structures' case study highlights how TES 2000 delivered a comprehensive Overhead Line upgrade across the Anglia Route for Network Rail. Discover our expertise in design, foundation construction, and the replacement of 55 structures, all while navigating embankment instability and intricate possession coordination.

Jarrow Road Bridge
As a critical artery for local transport and freight, the Jarrow Road Bridge over the River Tyne required essential upgrades to ensure its long-term safety and resilience. This case study details our role in delivering a comprehensive structural refurbishment, overcoming significant logistical and engineering challenges associated with working on a major waterway and a live transport network. Our expertise in complex rail infrastructure projects ensured the bridge was successfully renewed, providing a safer, more resilient lifeline for the local community and the region's economy.

Enhancing Operational Reliability
At Greater Anglia's Ilford Depot, life-expired track assets were causing significant movement under load. Discover how TES 2000, as Principal Contractor, engineered a precise S&C renewal, leveraging off-site pre-fabrication and strategic logistics to deliver enhanced operational reliability and long-term asset integrity.

Saxmundham Vital Track Renewal
Dive into the Saxmundham track renewal, where TES 2000 showcased meticulous planning and expert execution. Learn how our teams, in close partnership with Network Rail and other contractors, overcame complex logistical hurdles to deliver a safer, more efficient railway asset with unparalleled precision.

Seamless Upgrades
Despite complex site conditions and a tight 52-hour window, TES 2000 ensured a 'Seamless Upgrade' at the Camps User Worked Crossing. Our precision planning, innovative tools, and expert execution as Principal Contractor delivered a vital, safe, and efficient renewal without compromise. Read the full story here.

Delivering Excellence
In the rail industry, excellence isn't just an aspiration—it's the standard. This post explores our unwavering commitment to quality and precision on every project, big or small. From meticulous planning and execution to the final handover, we dive into the core principles that define our work. Read on to discover how our dedicated teams go above and beyond to not only meet but exceed client expectations, ensuring the long-term safety and reliability of our rail network.